Second Door Ltd
Prepared for Plentific Ltd · working view, updated regularly

Plentific Digital Relaunch

Project status and operating frame · Website 2.0

Status as of Wed 22 July 2026 · countdowns update live
Discoverylive V1 Buildplanned V2 Builddefined after Discovery

01Key dates

02Timeline

Jul to Nov 2026

The V1 Build bar shows the working plan: the build is scoped and confirmed at the close of Discovery, with the site live in the week of 26 October ahead of the November event.

03The operating frame

how the relaunch is decided, evidenced and produced

The relaunch draws on many inputs of different kinds and maturity: brand strategy and messaging documents, discovery interviews, analytics and search data, market and platform research, creative concepts. The Operating Frame gives every decision a place, an owner, an evidence base and a sign-off moment, so the project stays explainable at any point: what has been decided, on what evidence, and what happens next.

It has three parts: a strategic hierarchy of eight layers, from business outcomes at the top to build and measurement at the bottom, where decisions flow down and evidence flows up; an evidence discipline, where every input enters as an unverified hypothesis and graduates only through independent corroboration or a named sign-off; and a gated production process, where each gate is a scheduled sign-off with named owners, so decisions are made once, together, and stay made.

The four streams

StreamLayersCoversProject workstreams
Strategy1 · 2Business outcomes, audiences and the evidence base01 Strategic Brand Alignment · 05 Analytics & Measurement
Language3 · 4Positioning, vocabulary and messaging per audience01 Strategic Brand Alignment · 02 Content & Information Architecture
Experience5 · 6Journeys, information architecture and the content model02 Content & IA · 03 Design & User Experience
Delivery7 · 8Design system, platform build, launch and measurement03 Design & UX · 04 CMS & Technical · 06 Launch & Operations

Operating rules

Methodology in brief

Claims, not documents. Every source is decomposed into individual claims held in a single evidence register, classified by evidence type, confidence, decision weight and status.

Graduation. Claims move from unverified to corroborated to validated. Superseded claims are retired with a pointer, never deleted, so every decision stays traceable.

The validation bridge. Recommendations are built in four steps that cannot be skipped: evidence, interpretation, recommendation, validation.

Instruments. Behavioural and search analytics, session data, meeting transcripts, primary sources read directly, and peer-reviewed literature. AI research generates hypotheses and coverage; it never validates its own claims.

04Current state by layer

as of 21 July 2026
LayerDecidesState Evidence and decisionsOpenLead
1 · Business outcomesWhy the site exists; how success is measured Evidenced Objectives and KPI deck; leadership interviews; timeline anchors: design sign-off 12 Aug, site live end of October, event mid-November KPI targets formalised in the analytics specificationMirko + steering
2 · Audience & evidenceWho the site serves; what they need In progress Four of six discovery interviews coded; analytics, search and CRM baselines complete; audience priority agreed 20 Jul: buyers first, investors addressed through PR Two remaining interviews; navigation analytics; consent dataMirko
3 · PositioningThe category claim and vocabulary Direction set "One with AI" confirmed as the brand direction; staged language transition agreed 20 Jul Brand language and search demand decision to formalise; legal clearance of the claimJulia, with Cem
4 · MessagingThe words, per audience In motion House of Messaging and copy guidelines in final client review; three-level messaging scaffold ready to apply Final messaging guide; messaging matrix; brand and product glossaryJulia & Sara
5 · Journeys & experienceHow each audience reaches conversion Early Homepage identified as the conversion bottleneck; funnel research complete Navigation analysis; journey maps per audienceMirko + Sara
6 · IA & content modelSitemap, page inventory, content specification Gated on 3 Content sources collected and archived: testimonials, sales narratives, product material Sitemap after the language decision; content audit; German localisation scopeJulia & Sara
7 · Creative & design systemLook, components, design language Paused · critical path Creative concept in rebalance toward a more human expression, agreed 16 Jul Design brief; design foundation assets; concept pagesAli
8 · Build & measurementPlatform, code, tracking Ahead Payload selected 14 Jul; working prototype running; platform decision documents delivered; analytics access live Sixteen provisioning decisions with engineering; named engineering resource; analytics specificationMirko

Workstream leads follow the current project governance document, which is being updated; this table follows whatever version Plentific confirms.

05Gates

scheduled sign-off moments
GateEventDateSigns off
G1Website workshop, full teamMonday 27 JulyLayers 1 to 5: audience, positioning, messaging and journeys. Unblocks the information architecture and the design brief.
G2Design sign-off12 AugustLayers 6 and 7: information architecture, creative direction and the design system.
G3Launch readinessEnd of OctoberLayer 8: build complete, measurement live, operational runbook. Ready for the mid-November event.

Commercial checkpoints from the Discovery and Build agreements run alongside these gates and are tracked separately.

06Evidence highlights

website baseline · 12 months to 30 Jun 2026
101,689
sessions in the 12-month window
39%
engagement rate
99.4%
of organic clicks are brand terms: search is awareness, not demand generation
0.73%
homepage conversion on 78% of landings: the identified bottleneck
CWV pass
Core Web Vitals pass on all segments: protect, don't regress

These findings anchor the staged language transition and the journey work: new vocabulary is layered on top of the terms that currently earn traffic, and the homepage carries the first conversion redesign.

07Now and next

evidence converts upward into decisions and briefs

Second Door is delivering

  1. Gap and contradiction matrix, consolidating everything the evidence base has surfaced. This week.
  2. Updated project governance document to Plentific.
  3. Brand language and search demand decision, formalised with Julia and Cem.
  4. Workshop agenda and pack for Gate 1 on 27 July.
  5. Design brief, unblocking the design team toward the 12 August sign-off.

Open inputs from Plentific

  1. Figma access to the new-concept mock-ups and the Product Foundation library.
  2. HubSpot and Hotjar access, plus the consent-platform exports.
  3. Remaining discovery interviews: the product session on 29 July, and the customer-success reschedule.
  4. Product guide access: the full 5-step guide and glossary behind the product intro.
  5. Named engineering resource for the August build start.
Where this leads

Gate 1 closes the Discovery phase: its outputs feed the final discovery document and the costed build proposal, and every layer below then moves into production with its evidence attached.

08Decisions to date

most recent first
22 JulMessaging working baseline released: House of Messaging and copy guidelines adopted as the working base, refined as a living document.
20 JulAudience priority agreed: the website serves buyers first; investors are addressed through PR.
20 JulStaged language transition agreed: new vocabulary layered on top of the terms that currently earn attention and traffic.
20 Jul"One with AI" confirmed as the brand direction the new site is built on.
16 JulCreative rebalance agreed: the concept moves toward a more human, emotional expression.
14 JulPayload selected as the platform (Storyblok fallback): in-house, component-based build, code in Plentific's own repositories.